All the silt has now been removed from below the
'waterfall' at the ford area, lowering the water by a foot so it's now
level with the culvert base. The pumps are running again to divert the
stream past the work. 30/1/06 |
|
Back at The Old Forge the footings are being laid on the
culvert lid for the front garden wall to be rebuilt... 30/1/06 |
|
...and the rebuilding of the back garden wall is nearing
completion. 30/1/06 |
|
Remember the new blue water pipe at the top of Page 8?
That's now encased in concrete to protect it when the rest of the concrete
is poured (see next page). 31/1/06 |