Home Flood work index Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10
The lid pieces on the stretch under the road are larger
pre-formed units lowered into place by machine. 25/1/06 |
|
A long section gets it new lid, and the existing surface
water drain on the right is re-connected using new twin-wall plastic pipe. 25/1/06 |
|
Old (left) meets new (right). These pipes are about 10 to
12 inch internal diameter. 25/1/06 |
|
The lid through The Old Forge Garden is also almost
complete. 25/1/06 |