2006 Flood Relief Work - Page 5

Home   Flood work index   Page 1   Page 2   Page 3   Page 4   Page 5   Page 6   Page 7   Page 8   Page 9   Page 10

Take a last look at this scene. It's about to change for ever.
24/1/06
The trench for the concrete culvert nears the bridge/ford area. No access for the Simmons Yard houses to the right.
24/1/06
The junction box walls are complete and await their roof. Apparently this is to be cast in situ, using shuttering.
24/1/06
And more of the lid work is done on both sides. You won't see it in this size image, but upside down on the lintel above the large black plastic pipe is written the word 'Plymouth' - but I don't think the pipe is going that far!
25/1/06

Top