Good progress through the garden, no unexpected
obstructions, two new sections of pipe laid in a day. 9/3/06 |
|
As the open trench moves northwards, so the sections of
metal trackway are lifted again. 9/3/06 |
|
The pump is brought in in readiness for the final
diversionary action. 10/3/06 |
|
All the tarmac has to be applied and raked a barrow at a
time before the roller is used. That's Brian by the way in the white
helmet. He missed group photo on page 26. 10/3/06 |