During the last flood - 6/11/05 Looks a bit different today - 22/3/06
38 metres of roadside pipe and sinks is being replaced between The Old Forge and Victoria Cottages. The sinks are formed by casting concrete around a mould, then removing the mould the next day and fitting the slotted cover.
22/3/06
One more job done.
23/3/06
Work continues on The Old Forge's garden wall.
22/3/06
Another job done.
24/3/06