2006 Flood Relief Work - Page 33

Home   Flood work index   Page 31   Page 32   Page 33   Page 34   Page 35   Page 36   Page 37   Page 38

This has necessitated careful excavation to leave granite edging sets in place, cutting through steel reinforcement in the concrete beneath the cobbles, and carefully lifting the cobbles themselves for later replacement.
20/3/06
The new 300ml twin-wall pipe is embedded in concrete, ready for the cobbles to be re-laid.
21/3/06
Across the road the line for the trench excavation has been cut and the tarmac/concrete surface is broken up.
21/3/06
Back behind St Clements Terrace the new inlet for the western stream takes shape.
21/3/06