Topsoil has been returned to The Old Forge's garden, ready for restoration work.
16/3/06

 

Now several large shrubs have been replanted in the gap and stone has been delivered ready for the wall-builders to rebuild the wall next week...
17/3/06

...and the upper pool of the ford area has been dredged of silt.
17/3/06

A late addition to the overall project was the decision to replace the blocked length of old stone-built drain along the southern edge of the road past Victoria Cottages to the bridge. However, instead of following the southern road edge to the bridge (crossing the entrance to The Old Forge), the replacement is crossing the road at an angle and issuing into the lower pool before the bridge.
20/3/06